Case Studies

Full Bathroom Renewal in Wellsford

Case Studies

Full reinstatement and renewal of ensuite bathroom

Following water damage in the ensuite bathroom, Resolution Contracting was engaged by an insurance provider to safely remove and remediate contaminated materials while restoring the space to full functionality. The damage required careful stripout of all affected wall linings, ceiling gib, and flooring, along with bleach cleaning of timber framing to ensure the area was hygienic and compliant with building standards.

Our team managed the full reinstatement of the ensuite, including installation of new wall and ceiling linings, finishing lines, plastering, and painting. Waterproofing and tiling were completed to high standards, with the owner selecting tiles to suit their design preference. The bathroom vanity and mirror were replaced and all plumbing and electrical connections were carefully reinstalled to ensure full functionality. Throughout the project, every stage was checked and signed off to maintain quality and compliance.

We worked closely with the homeowners tenants to minimise disruption and involve them in key decisions and worked along the homeowners to carryu out some upgrades ensuring the bathroom met both their practical needs and aesthetic expectations. The project was completed efficiently, returning a fully functional and refreshed ensuite for daily use.

Client Testimonials

“We were anxious about the damage and how long it would take to restore our bathroom as we had never made a claim before with our insurer. Resolution guided us through every step, kept us informed and ensured everything was done properly. Resolution delivered a bathroom that exceeded our expectations and we couldn’t be happier with the result.”

– Homeowner, Wellsford

Let’s talk about your project

We’re keen to discuss your project and see how we can add value.